Quote checklist
Select the product type, quantity, emirate and delivery date. That is enough for our sales team to price supply and logistics clearly.
- Product and quantity
- Delivery emirate
- Date or deadline
132kV/400kV corridor identifiers with bilingual recessed text.
Indicative price AED 40 – 85 Subject to specification and quantity. Final quote on request.
Concrete Utility Route Markers are non-negotiable safety assets for the protection of buried infrastructure. These surface-level indicators provide visual confirmation of underground service corridors, including High Voltage (HV) cables, water pipelines, and fiber optic networks.
In accordance with DEWA and utility provider regulations, these markers serve as a permanent “No Dig” warning to excavation contractors, preventing costly service strikes and potentially fatal accidents.
| Specification | Value |
|---|---|
| Base Dimensions | 300mm x 300mm (Standard) |
| Top Dimensions | 150mm x 150mm |
| Height | 300mm - 400mm |
| Material | Mass Concrete |
| Marking Depth | >5mm recess |
| Installation Depth | ~2/3 buried |
Supply of high-quality precast concrete solutions across UAE. Fast, reliable and built to last — delivered on time.
Select the product type, quantity, emirate and delivery date. That is enough for our sales team to price supply and logistics clearly.
For concrete or Jersey barriers, share the length mix, quantity, required colour or reflectors, and whether offloading support is needed.
For bunkers and concrete shelters, send the internal size, opening direction, lifting access and any security or utility requirements.
T-walls and blast walls need the wall type, height, quantity, installation sequence and site access constraints before pricing.
For manholes and chambers, attach the drawing or share clear opening size, depth, cover load class and pipe entries.
For wheel stoppers, confirm the quantity, fixing requirement, site or basement access, and whether line marking is already complete.
For masonry blocks, send the block size, pallet quantity, delivery zone and whether phased deliveries are required.
For hoarding blocks, confirm the fence length, block spacing, gate locations and site access for unloading.
For plastic barriers, share the required quantity, colour, reflective tape needs, filling preference and event or roadwork date.
We're here to help with your project
Share your requirements and we'll get back to you within 24 hours.